top of page

CATHOLIC SCHOOL ADDITION

Alhambra, Ca

(under construction)

New building complex of 10 classrooms, media library, faculty offices, nurse's, performing arts room, counseling/supportive offices, outdoor covered gathering space and community garden.

Images from the ground breaking ceremony September 2021)

CATHOLIC SCHOOL ADDITION

Hermosa Beach, Ca

(wrapping up construction, set to be complete Fall 2021)

New building addition to house faculty complex with lobby, offices, conference and break room as well as S.T.E.A.M. and Music classrooms. Music room opens up to new outdoor "living room" for the extended parish community

SINGLE FAMILY DWELLING

Brentwood, Ca

(currently in plan check)

Ground up remodel of single family residence to include 5 bedrooms, 6 baths, game room, home office, full kitchen with wet bar and new patio deck.

SUPPORTIVE HOUSING FOR FEMALE STUDENTS EXPERIENCING HOMELESSNESS

East Hollywood, Los Angeles

(unbuilt)

Adaptive-reuse of existing building to accommodate dorms for 10 students at local junior college. Includes common living room space and kitchen, break-out rooms for support and counseling, and shared garden space.

cols 01-1-ANIMATION.gif

CATHOLIC SCHOOL 

Torrance, Ca

(CONCEPTUAL, UNBUILT)

New early education complex for preschool, transitional kindergarten, and kindergarten. 

FOURPLEX

Highland Park, Los Angeles

(unbuilt)

Imagining a way to create density with multi-generational families in mind, two neighboring properties with traditional craftsman homes are combined, with an additional bar spanning the two homes to make a total of 4 units.

  • Black Instagram Icon
  • Black LinkedIn Icon
  • Black Instagram Icon

©2021 JESSICA GARDNER 

bottom of page